1

Advanced 400 kW Chiller Installation Secures £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Cut

News Discuss 
Project Highlight Newsome has successfully delivered the installation and commissioning of a modern 400 kW chiller at a major confectionery manufacturing site in York. Designed to strengthen ESG targets, the installation improves system dependability while lowering overall energy usage and CO₂ levels. https://ledbookmark.com/story6450455/high-efficiency-400-kw-chiller-installation-delivers-50k-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story